Per the covenants, any exterior addition, change, or alteration to your dwelling or lot must be submitted to and approved in writing by the Architectural Control Committee before work begins. This includes structures, landscaping, fencing, and more.
If the Committee does not respond within 30 days of receiving your submission, approval is considered granted.
Requires approval
- Fences & walls
- In-ground swimming pools & spas
- Basketball goals & play equipment
- Attached solar heating panels
- Landscaping changes
- Exterior additions or alterations
- Driveways (non-standard material or width)
- Satellite dishes over 12 sq ft
Does not require approval
- Interior renovations
- Replacing existing materials in kind
- Standard concrete driveways (16 ft wide)
- Underground utility connections
- Ornamental yard lighting (underground wired)
- Required landscaping at construction per §7.39 (12 shrubs, 1 tree)
Ready to submit?
Submit your plans by email
Email your plans to the board using the template below, and attach any relevant photos, sketches, or documents. Your submission will go directly to the Architectural Control Committee. The committee has 30 days to respond — if you don't hear back, approval is considered granted.
- Click Open in email. A new email opens with everything filled in except your answers.
- Type your answers after each line.
- Attach any photos, sketches, or plans, then send.
- Email doesn’t open? Click Copy template, paste it into a new email, and send it to the address below.
Send to: dickinsonfarmshoaboard@gmail.com
Subject: Architectural Plan Submission
Your name: Lot address: Phone number (optional): Type of project (Fence or wall / Swimming pool or spa / Play equipment or basketball goal / Solar panels / Landscaping / Exterior addition or alteration / Driveway / Other): Project description (materials, dimensions, colors, and where on the lot it will be located): Proposed start date (optional): Attachments: photos, sketches, or plans attached
By sending your plans you confirm that work will not begin until written approval is received, or 30 days have passed without a response per §6.4 of the HOA covenants.